Design and Build a Tunnel Carwash:
A Step-by-Step Procedure

  1. Understand that this type of project can start out at nearly 1 million dollars and go up from there. Contact a quality equipment manufacturer or dealer.
  2. Find a location with the following characteristics: High traffic volume, retail and shopping near by. Average speed limit of 45 mph or less. Little or no direct competition. Perform a site study.
  3. Check zoning and verify utilities. Make sure sewer is available.
  4. Establish budget from personal finances, lending sources etc.
  5. Survey property and get soil borings, environmental reports etc.
  6. Begin architectural drawings.
  7. Complete civil drawings.
  8. Contract with equipment supplier. At this point your chosen equipment supplier will help with site plan and assist you at city meetings.
  9. Submit for site plan approval.
  10. Complete architectural drawings.
  11. Apply for building permits.
  12. Disperse for subcontractor cost proposals/finalize construction costs.
  13. Excavate for footings and foundation.
  14. Building and site construction.
  15. Equipment installation.
  16. Final inspection.
  17. Open for business.